Stormwater Detention Basin Retrofitting
![]() Morris Township Detention Basin: 10/19/96 |
Principal Investigators: | Qizhong Guo |
| Sponsors: | The U.S. Environmental Protection Agency through the New Jersey Department of Environmental Protection. | |
| Duration: | 1996 - Present | |
| Objectives: | To study the retrofitting of existing storm water detention basins with respect to water quality. | |
| Methods: | Sigma Rain Gauge, Sigma 950 Flow Meter (3), Sigma 900 Portable Sampler (2), Laboratory Testing, TR-55, SWMM. |
![]()
Publications and Reports
The first phase of the project:
![]()
Project Summary
The second phase of the project:
Morris Township Detention Basin
![]()